[Year 12 SofDev] Limited SAT Scope and criteria
Robert Hind
robert at yinnar.com
Thu Jun 9 13:07:52 AEST 2016
Assessment criteria rubric available online
http://www.vcaa.vic.edu.au/Documents/vce/computing/Informatics_SBA.pdf
Robert Hind
Ex Traralgon and Ashwood
Retired
_____
From: sofdev-bounces at edulists.com.au [mailto:sofdev-bounces at edulists.com.au]
On Behalf Of Ciappara, Anthony A
Sent: Thursday, 9 June 2016 11:26 AM
To: Year 12 Software Development Teachers' Mailing List
Subject: Re: [Year 12 SofDev] Limited SAT Scope and criteria
Hi Robert
Where did that quote come from?
Thanks
Anthony
_____
From: sofdev-bounces at edulists.com.au [sofdev-bounces at edulists.com.au] on
behalf of Robert Hind [robert at yinnar.com]
Sent: Wednesday, 8 June 2016 3:52 PM
To: 'Year 12 Software Development Teachers' Mailing List'
Subject: Re: [Year 12 SofDev] Limited SAT Scope and criteria
I am not teaching at present BUT on reading through criteria 1 to 3 it seems
to me that the size of the project only comes into criterion 2 where for a
top mark the student
"
Acquires multiple complex data
sets of different types of data,
qualities and structures from both
primary and secondary data
sources. Uses appropriate
methods to acquire data from
both types of sources."
but the quantity of data is not specified.
Robert Hind
Ex Traralgon and Ashwood
Retired
_____
From: sofdev-bounces at edulists.com.au [mailto:sofdev-bounces at edulists.com.au]
On Behalf Of Ciappara, Anthony A
Sent: Wednesday, 8 June 2016 3:13 PM
To: Year 12 Software Development Teachers' Mailing List
Subject: [Year 12 SofDev] Limited SAT Scope and criteria
Hi everybody
Just wondering how people handled marking criteria 1-3 when the size of SAT
project scopes differed.
How does a limited SAT scope affect student results for criteria 1-3?
If a student has a simple SAT project with limited functions are they able
to score maximum marks for criteria 1-3. What if they get everything right,
it's all perfect, but the project is just limited in size?
Eg. A student has a simple project. It validates data, does a simple
calculation or two, saves data and allow the user to retrieve data. That's
it. They address all criteria perfectly, based on this simple project. All
their diagrams, SRS and design work is perfect but quite basic because of
their limited scope. Where do their results stand compared to a student who
has a more difficult project and makes a couple errors? The student with the
more difficult project has a lot more correct, good quality work than the
student with the simple project.
I've read as much documentation as I can find but cannot see this scenario
mentioned.
Thanks in advance
Anthony Ciappara
Important - This email and any attachments may be confidential. If received
in error, please contact us and delete all copies. Before opening or using
attachments check them for viruses and defects. Regardless of any loss,
damage or consequence, whether caused by the negligence of the sender or
not, resulting directly or indirectly from the use of any attached files our
liability is limited to resupplying any affected attachments. Any
representations or opinions expressed are those of the individual sender,
and not necessarily those of the Department of Education and Training.
_____
No virus found in this message.
Checked by AVG - www.avg.com
Version: 2016.0.7639 / Virus Database: 4591/12355 - Release Date: 06/03/16
Important - This email and any attachments may be confidential. If received
in error, please contact us and delete all copies. Before opening or using
attachments check them for viruses and defects. Regardless of any loss,
damage or consequence, whether caused by the negligence of the sender or
not, resulting directly or indirectly from the use of any attached files our
liability is limited to resupplying any affected attachments. Any
representations or opinions expressed are those of the individual sender,
and not necessarily those of the Department of Education and Training.
_____
No virus found in this message.
Checked by AVG - www.avg.com
Version: 2016.0.7639 / Virus Database: 4598/12380 - Release Date: 06/07/16
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://www.edulists.com.au/pipermail/sofdev/attachments/20160609/7c3052c0/attachment.html
More information about the sofdev
mailing list